[Note: If the collected material is a hazardous waste under R.61-79.261, it is subject to management as a hazardous waste in accordance with all applicable requirements of R.61-79.262 through R.61-79.266.
If the collected material is discharged through a point source to waters of the State, it is subject to the requirements of SC Pollution Control Act and sections301, 304, and 402 of the Clean Water Act, as amended. If discharged to a Publicly Owned Treatment Works (POTW), it is subject to the SC Pollution Control Act and the requirements of section307 of the Clean Water Act, as amended. If the collected material is released to the environment, it may be subject to the SC Pollution Control Act and the reporting requirements of 40 CFR part 302.]
[Note: The provisions outlined in the Steel Tank Institutes (STI) Standard for Dual Wall Underground Steel Storage Tanks may be used as guidelines for aspects of the design of underground steel doublewalled tanks.]
[Note: The practices described in the American Petroleum Institute (API) Publication Guide for Inspection of Refinery Equipment, Chapter XIII, Atmospheric and Low Pressure Storage Tanks, 4th edition, 1981, may be used, where applicable, as guidelines for assessing the overall condition of the tank system.]
S.C. Code Regs. § 61-79.264.J.193