Section 61-107.4.IV.A - Permit Application Process

The applicant shall submit a permit application to the Department. The permit application shall include one hard copy and one electronic copy of the following:

1. A completed and signed application form provided by the Department;
2. Tax map number for the site;
3. Proof of ownership or control of the property;
4. For Type Two or Type Three facilities, a signed statement, on a Department-provided form, from a South Carolina licensed professional engineer, certifying that the site design is compliant with the requirements of this regulation;
5. A vicinity map that shows the location of the facility and the area that is within one mile of the property boundary;
6. A site plan on a scale of not greater than 100 feet per inch that shall, at a minimum, identify the following:
a. The facility perimeter, the operational area, and all storage areas with measurements in feet;
b. Compliance with required buffers as outlined in this regulation;
c. Property lines, access roads, gates, fences, natural barriers, or other Department-approved means of preventing unauthorized access and dumping;
d. A topographical survey of the site depicting two-foot contours at a minimum, and six-inch contours for sites evaluated for consistency with the South Carolina Coastal Zone Management Plan;
e. A description of any Best Management Practices (BMPs) used for the management of storm water;
f. The location of, and distance to, any Waters of the State on site of the facility or within the buffer areas described in Part III.C;
7. An operational plan that shall contain all items as required under this regulation;
8. Any request for a variance as allowed by this regulation; and
9. A final closure cost estimate pursuant to this regulation.