Current through Register Vol. 48, 12, December 27, 2024
Section 61-107.4.IV.A - Permit Application Process The applicant shall submit a permit application to the Department. The permit application shall include one hard copy and one electronic copy of the following:
1. A completed and signed application form provided by the Department;2. Tax map number for the site;3. Proof of ownership or control of the property;4. For Type Two or Type Three facilities, a signed statement, on a Department-provided form, from a South Carolina licensed professional engineer, certifying that the site design is compliant with the requirements of this regulation;5. A vicinity map that shows the location of the facility and the area that is within one mile of the property boundary;6. A site plan on a scale of not greater than 100 feet per inch that shall, at a minimum, identify the following:a. The facility perimeter, the operational area, and all storage areas with measurements in feet;b. Compliance with required buffers as outlined in this regulation;c. Property lines, access roads, gates, fences, natural barriers, or other Department-approved means of preventing unauthorized access and dumping;d. A topographical survey of the site depicting two-foot contours at a minimum, and six-inch contours for sites evaluated for consistency with the South Carolina Coastal Zone Management Plan;e. A description of any Best Management Practices (BMPs) used for the management of storm water;f. The location of, and distance to, any Waters of the State on site of the facility or within the buffer areas described in Part III.C;7. An operational plan that shall contain all items as required under this regulation;8. Any request for a variance as allowed by this regulation; and9. A final closure cost estimate pursuant to this regulation.S.C. Code Regs. § 61-107.4.IV.A
Replaced and amended by State Register Volume 38, Issue No. 6, eff 6/27/2014; State Register Volume 45, Issue No. 05, eff. 5/28/2021.