Current through Register Vol. 48, No. 10, October 25, 2024
Section 61-107.3.IV.C - Permit Requirements for Waste Tire Processing Facilities1. All applications for permits required by this regulation shall be submitted to the Department on forms provided by the Department. No construction of a proposed facility or equipment shall begin until all permits required by the Department are final.2. The application for a waste tire processing facility shall be on a form provided by the Department, and shall contain at a minimum the following: a. Proof of ownership of the property upon which the waste tire processing facility will be located;b. Site maps or other documentation detailing the location and site design requirements of Part III.C of this regulation;c. A plan outlining the operational requirements of Part III.D of this regulation;d. A description of the tire processing equipment, including manufacturer's information, for determination of throughput;e. A closure plan, which shall include at a minimum the following: (1) A schedule for removal of all waste or processed tires and residuals; and,(2) Certification that all waste or processed tires remaining on site will be transported to a permitted processing or disposal facility and that closure shall be performed in accordance with Part V of this regulation; and,f. Documentation that the applicant has secured financial assurance in accordance with Part V of this regulation.S.C. Code Regs. § 61-107.3.IV.C
Replaced and amended by State Register Volume 39, Issue No. 06, eff. 6/26/2015.