Current through Register Vol. 48, 12, December 27, 2024
Section 18-15 - Maintenance and Replacement of EquipmentA. The Agency will maintain (or cause to be maintained) all vending facility equipment in good repair and in attractive condition, and will replace (or cause to be replaced) worn out or obsolete equipment as required to assure the continued successful operation of the facility, subject to the availability of funds.B. Maintenance and repair of equipment will be authorized by the BEP Counselor with the approval of the BEP Director upon the request of the Blind Licensed Vendor.C. All repairs of equipment by other companies must be completed within 15 working days. If not, the BEP Counselor will be required to intervene to hasten the completion of the repair and return of the equipment.D. Each Blind Licensed Vendor will be responsible for taking reasonable care of the equipment in the facility and will carry out routine day-to-day preventative maintenance procedures as required.Amended by State Register Volume 28, Issue No. 3, eff March 26, 2004.