Current through Register Vol. 48, No. 10, October 25, 2024
Section 103-371 - ORS Inspections and TestsThe ORS shall make tests of meters as follows:
a. Upon written request to the commission or ORS by a customer or an electrical utility, a test will be made of the customer's meter as soon as practicable.b. On receipt of such request, the ORS shall notify the electrical utility, and the electrical utility shall not knowingly remove or adjust the meter until instructed by the ORS. The ORS shall supervise the test of the meter, using the standard approved by the commission with such standard being compared with the electrical utility's standard. The results of the test shall be made available to the customer.c. The customer shall be notified of the test in sufficient time to allow the customer or the customer's representative to be present.d. The ORS shall make a written report of the results of the test to the customer and to the electrical utility.S.C. Code Regs. § 103-371
Amended by State Register Volume 32, Issue No. 5, eff May 23, 2008.