S.C. Code Regs. § § 103-324

Current through Register Vol. 48, No. 10, October 25, 2024
Section 103-324 - Meter Seal

Immediately after the pre-installation or field test of a meter, the manufacturer or the electrical utility shall affix a seal or locking device in order to avoid tampering. The meter installation shall be sealed or locked to help prevent tampering or theft of current.

S.C. Code Regs. § 103-324

Amended by State Register Volume 32, Issue No. 5, eff May 23, 2008.