All commercial renewable energy systems shall be required to provide the municipality and respective tax assessor with a copy of the initial interconnection application and final interconnection service agreement and any documentation of program enrollment (e.g., renewable energy growth or net metering enrollment forms), indicating whether the commercial renewable energy system is either a REG, net-metered, or virtual net metered installation.
300 R.I. Code R. 300-RICR-00-00-2.8