300-00-00 R.I. Code R. § 1.12

Current through August 19, 2024
Section 300-RICR-00-00-1.12 - Project Inspections
A. OER, or its designated representative, may inspect the project at any time during the construction process and following project completion.
1. Energy efficiency projects: All applicants are required to have an independent third party inspection of the energy efficiency measure after construction is completed. A copy of the commissioning report (hard copy and electronic copy) shall be forwarded to OER and RIIB within thirty (30) days following the commissioning.
2. Solar PV projects: All applicants are required to have an independent third party inspection of the renewable energy project after interconnection. Third party independent inspections completed pursuant to existing state programs are acceptable. A copy of the inspection report (hard copy and electronic copy) shall be forwarded to OER and RIIB within thirty (30) days following the inspection.
3. Wind projects: All applicants are required to have an independent third party inspection of the renewable energy system after interconnection. Third party independent inspections completed pursuant to existing state programs are acceptable. A copy of the inspection report (hard copy and electronic copy) shall be forwarded to OER and RIIB within sixty (60) days following the inspection.
B. Inspections for all other eligible projects shall be determined as necessary.

300 R.I. Code R. § 300-RICR-00-00-1.12