Section 250-RICR-140-25-2.14 - Spill Prevention and Emergency Plans
A. This section is applicable to any owner or operator of a reception facility, terminal, or facility with outdoor ASTs exceeding a combined storage capacity of five hundred (500) gallons. This section is not applicable to facilities with ASTs storing oil for heating with a capacity of five hundred (500) gallons or less.
B. Any person subject to this section shall, within six (6) months of the effective date of these Regulations, have readily available at the facility an emergency plan, which shall, at a minimum, contain the following information:
1. Up-to-date schematic diagrams showing the location of all outdoor tanks and piping used for the storage and conveyance of oil, including the location of all emergency shutoff valves;
2. A description of on-site emergency containment and cleanup equipment;
3. Description of off-site auxiliary emergency equipment that can be readily obtained, including a listing of cleanup contractors to contact for such equipment;
4. Emergency telephone numbers of local, State and Federal officials who should be contacted in case of an oil spill.
C. Upon request by an employee or agent of DEM, emergency plans shall be made available for inspection and copying.
D. Emergency plans or other similar spill prevention control plans required under other Federal or State requirements may be substituted for the plan required by this section provided the plan contains at a minimum, the requirements of §§ 2.14(B)(1) through (4) of this Part.