Although the Department will assist the contractor in obtaining a central site for pesticide collection prior to transportation and disposal, the decision whether to use a particular site for pesticide collection is exclusively the contractor's. The contractor is responsible for establishing, insuring and operating the site and is responsible in the event of a pesticide spill or other environmentally-impacting incident which gives rise to legal liability.
7 Pa. Code § 128b.16
The provisions of this §128b.16 amended under section 7(b)(2) of the Pesticide Control Act of 1973 (3 P. S. § 111.27(b)(2)).