Portions of single-cross plots not meeting certification requirements shall be destroyed before field inspection is completed if the balance of the plot is to qualify for certification.
7 Pa. Code § 115.173
Portions of single-cross plots not meeting certification requirements shall be destroyed before field inspection is completed if the balance of the plot is to qualify for certification.
7 Pa. Code § 115.173