The Office of Blindness and Visual Services (BVS) will notify the vendor by memorandum that the facility is scheduled for renovation during the next 6 months. BVS staff prepares the plans for renovations in cooperation with the vendor and the owner. The final plans shall be approved and signed by the vendor and the owner. BVS then completes renovations in accordance with the procedure for the initial design and construction of the facility.
55 Pa. Code § 2430.122