Current through Register Vol. 54, No. 49, December 7, 2024
Section 57.255 - EDC responsibilities regarding advanced metering(a) Upon written request from both a customer and the EGS of that customer, the EDC shall make available and install for use a qualified advanced meter or meter-related device. The qualified advanced meter shall be the customer's billing meter and shall meet certain standards established by the Commission in § 57.254 (relating to advanced meter standards).(b) A qualified advanced meter, meter-related device and network, as well as related infrastructure, shall be owned and operated by the EDC as part of its regulated local distribution function. A network may be owned by an EDC or its chosen network provider. An EDC shall be responsible for compliance with the applicable requirements related to installation, calibration, maintenance, testing, physical reading, safety and reliability, as well as installing and maintaining associated infrastructure as applicable.(c) An EDC shall provide meter reading for billing purposes except when the customer has chosen to receive a separate generation supply bill from its EGS.(d) An EDC shall install and make operational a qualified advanced meter or meter-related device within 20 business days from the date the request is received by an EDC.(e) An EDC shall physically read an automated meter in compliance with § 56.12(5)(i) (relating to remote meter reading; estimated billing; ratepayer readings).(f) The EDC shall develop a procedure to ensure that qualified advanced meters or meter-related devices are available for installation as required in this subchapter. The EDC may purchase and stock the meters, meter-related devices or may otherwise arrange with EGSs and other EDCs for the most economical way to ensure availability.(g) An EDC responsible for providing metering services on a customer's premises shall ensure that the work be done by responsible individuals whose activities in the performance of these services are under the control of the EDC and who are qualified to perform the work according to the EDC's specifications and good utility practices.(h) If the Commission approves a restructuring settlement agreement incorporating EDC metering responsibilities contrary to the provisions in any section of this subchapter, the terms and conditions of the agreement shall, to the extent applicable, govern EDC responsibilities. This section cited in 52 Pa. Code § 57.251 (relating to purpose).