Section 57.152 - Formats

In preparing the Annual Resource Planning Report required by this subchapter, each EDC shall use the current forms and schedules specified by the Commission, which shall include the following:

(1) ARPR 1-Historical and Forecast Energy Demand.
(2) ARPR 2-Historical and Forecast Connected Peak Load.
(3) ARPR 3-Historical and Forecast Number of Connected Customers.
(4) ARPR 4-Historical and Forecast Peak Load and Energy.
(5) ARPR 5-Existing Generating Capability.
(6) ARPR 6-Future Generating Capability Installations, Changes and Removals.
(7) ARPR 7-Projected Capacity and Demand.
(8) ARPR 8-Qualifying Facility and Independent Power Production Facilities.
(9) ARPR 9-Scheduled Imports and Exports.
(10) ARPR 10-Summary of Demands, Resources and Energy for the Previous Year.
(11) ARPR 11-Transmission Line Projection.
(12) ARPR 12-Conservation and Loan Management Program Description.