A utility required under 66 Pa.C.S. § 515(a) (relating to construction cost of electric generating units) to submit an estimate of the construction costs of electric generating units shall file the following information with the Commission as part of that estimate:
52 Pa. Code § 57.103
The provisions of this § 57.103 issued under Public Utility Code, the Public Utility Code, 66 Pa.C.S. § § 501, 515, 1301 and 1308.
This section cited in 52 Pa. Code § 53.53 (relating to information to be furnished with proposed general rate increase filings in excess of $1 million); 52 Pa. Code § 57.104 (relating to construction management program); and 52 Pa. Code § 57.105 (relating to construction monitoring program).