Current through Register Vol. 54, No. 50, December 14, 2024
Section 3a.112 - Inspection preparation(a) An owner or user shall prepare a boiler or unfired pressure vessel for internal inspection in accordance with the ANSI/NB23 after a inspector provides notification.(b) The inspector will not inspect a boiler or unfired pressure vessel that is not properly prepared for an internal inspection.