28 Pa. Code § 119.45

Current through Register Vol. 54, No. 45, November 9, 2024
Section 119.45 - Construction

Construction of the short-term procedure operating room shall conform to the requirement of Chapter 153 (relating to construction standards) with regard to all of the following:

(1) Electrical circuitry.
(2) Conductive flooring.
(3) Wiring.
(4) Circuit breakers.
(5) Isolation transformers.
(6) Emergency lighting.
(7) Power installations.

28 Pa. Code § 119.45