25 Pa. Code § 273.112

Current through Register Vol. 54, No. 25, June 22, 2024
Section 273.112 - Facility plan

An application to operate a municipal waste landfill shall contain a narrative describing the following:

(1) The general operational concept for the proposed facility, including the origin, composition and weight or volume of solid waste that is proposed to be disposed of at the facility, the type of liner system, the proposed capacity of the facility, the expected life of the facility and the size, sequence and timing of solid waste disposal operations at the facility.
(2) A detailed description of the volume of soil needed to construct and operate the facility and of the method by which the soil will be delivered. The description will include the number of trucks, the access roads they will use, delivery times and any other information relevant to assessing the impacts of the operation.

25 Pa. Code § 273.112

The provisions of this § 273.112 adopted April 8, 1988, effective 4/9/1988, 18 Pa.B. 1681; amended October 9, 1992, effective 10/10/1992, 22 Pa.B. 5105; amended December 22, 2000, effective 12/23/2000, 30 Pa.B. 6685.

This section cited in 25 Pa. Code § 273.111 (relating to general).