25 Pa. Code § 263a.12

Current through Register Vol. 54, No. 25, June 22, 2024
Section 263a.12 - Transfer facility requirements

In addition to the requirements incorporated by reference:

(1) A transporter storing hazardous waste at a transfer facility for periods of not more than 10 days but greater than 3 days shall prepare an in-transit storage preparedness, prevention and contingency plan in addition to the transporter contingency plan as required by § 263a.13(b)(4) (relating to licensing). This plan shall be submitted under section 403(b)(10) of the act (35 P. S. § 6018.403(b)(10)) and approved in writing by the Department prior to the initiation of the storage.
(2) A transporter transferring hazardous waste from one vehicle to another at a transfer facility shall prepare an in-transit storage preparedness, prevention and contingency plan in addition to the transporter contingency plan as required by § 263a.13(b)(4). This plan shall be submitted under section 403(b)(10) of the act and shall be approved in writing by the Department.

25 Pa. Code § 263a.12

The provisions of this § 263a.12 amended December 13, 2002, effective 12/14/2002, 32 Pa.B. 6102; amended January 9, 2009, effective 1/10/2009, 39 Pa.B. 201.

The provisions of this § 263a.12 amended under sections 105, 402 and 501 of the Solid Waste Management Act (35 P. S. §§ 6018.105, 6018.402 and 6018.501); sections 303 and 305(e)(2) of the Hazardous Sites Cleanup Act (35 P. S. §§ 6020.303 and 6020.305(e)(2)); section 5, 402 and 501 of The Clean Streams Law (35 P. S. §§ 691.5, 691.402 and 691.501); and section 1920-A of The Administrative Code of 1929 (71 P. S. §§ 510-20).

This section cited in 25 Pa. Code § 287.102 (relating to permit-by-rule).