25 Pa. Code § 94.41

Current through Register Vol. 54, No. 25, June 22, 2024
Section 94.41 - Elimination of overload

A ban may be removed by the Department, in the exercise of its discretion, in accordance with the following conditions:

(1) If the permittee has demonstrated that steps have been taken which have resulted in the reduction of the actual loading to the plant to less than the capacity provided in the permit or, in the case of a sewer system, to eliminate the hydraulic overload, the ban may be removed to allow connections up to capacity.
(2) If it is affirmatively demonstrated, through the submission by the permittee and approval by the Department of an application for an amendment to the permit, that the actual capacity of the plant is in excess of the capacity provided in the existing permit and is sufficient to prevent an overload until additional capacity is made available, the ban may be removed to allow connections up to the new capacity.

25 Pa. Code § 94.41

The provisions of this § 94.41 adopted November 4, 1977, effective 11/21/1977, 7 Pa.B. 3259; amended October 3, 1980, effective 10/4/1980, 10 Pa.B. 3917.

The provisions of this § 94.41 issued under section 9 of the Pennsylvania Sewage Facilities Act (35 P. S. § 750.9).