Current through Register Vol. 54, No. 45, November 9, 2024
NPDES permits for each CAFO must include, but are not limited to, conditions requiring the following:
(1) Compliance with the Nutrient Management Plan, the Preparedness, Prevention and Contingency Plan and the Erosion and Sediment Control Plan.(2) A separate NPDES permit for stormwater discharges associated with a construction activity meeting the requirements of Chapter 102 (relating to erosion and sediment control) when applicable.(3) Compliance with 3 Pa.C.S. Chapter 23 (relating to the Domestic Animal Law).(4) Compliance with § 91.36 (relating to pollution control and prevention at agricultural operations).(5) Recordkeeping and reporting requirements as described in the permit.(6) When applicable, effluent limitations and other conditions as required under § 92a.12 (relating to treatment requirements) to meet water quality standards, for treated wastewater discharges.(7) Measures necessary to prevent the discharge to surface water from storage of raw materials such as feed and supplies, which are not otherwise included in the nutrient management plan.