25 Pa. Code § 110.503

Current through Register Vol. 54, No. 44, November 2, 2024
Section 110.503 - Measuring requirement in critical water planning areas
(a) The Department may require persons subject to § 110.201 (relating to registration requirement) located within a critical water planning area to measure or calculate their withdrawals and uses by means of a more accurate measuring method (but not more accurate than 5%) and record the measurements on a more frequent basis (not to exceed daily) than required in accordance with §§ 110.501 and 110.502 (relating to metering and measuring requirement; and recording frequency), if the Department determines that more accurate data is required for the development of a critical area resource plan in a watershed within a critical water planning area. Upon receipt of written notice from the Department, including an explanation of the basis for the determination, those persons shall begin the measurements or calculations within 180 days.
(b) In making the determination, the Department will consider the necessity of requiring more accurate data and having it recorded more frequently than required by §§ 110.501 and 110.502, from various categories of water users, for effective critical area resource planning in the specific watershed and the costs to registrants of providing the accuracy and frequency.

25 Pa. Code § 110.503