Current through Register Vol. 54, No.43, October 26, 2024
Section 90.98 - Topsoil: storage(a) Topsoil and other materials removed under § 90.97 (relating to topsoil: removal) shall be stockpiled only when it is impractical to promptly redistribute the material on regraded areas.(b) Stockpiled materials shall be selectively placed on a stable area within the permit area and located where the material, unless approved by the Department, will not be moved until required for redistribution on the regraded area or otherwise disturbed by the coal refuse disposal activities.(c) Stockpiled material shall be protected from wind and water erosion, unnecessary compaction and contaminants which lessen the capability of the materials to support vegetation when redistributed. Protective measures shall be accomplished by one of the following:(1) An effective cover of nonnoxious, quick-growing annual and perennial plants, seeded or planted as soon as weather and planting conditions permit.(2) Other methods demonstrated to and approved by the Department in writing to provide equal protection.The provisions of this §90.98 adopted December 19, 1980, 10 Pa.B. 4789, effective 7/31/1982, 12 Pa.B. 2382; amended July 30, 1982, 12 Pa.B. 2473, effective 7/31/1982, 12 Pa.B. 2382. This section cited in 25 Pa. Code § 90.33 (relating to reclamation plan); 25 Pa. Code § 90.92 (relating to signs and markers); 25 Pa. Code § 90.122 (relating to coal refuse disposal); 25 Pa. Code § 90.140 (relating to haul roads and access roads: restoration); and 25 Pa. Code § 90.163 (relating to prime farmland: soil stockpiling).