25 Pa. Code § 88.50

Current through Register Vol. 54, No. 25, June 22, 2024
Section 88.50 - Erosion and sedimentation control plan

The reclamation plan shall include the necessary information to demonstrate how the proposed sediment control measures will meet the requirements of Chapter 102 (relating to erosion and sediment control) and the additional erosion control requirements of Subchapter B, C or D (relating to surface anthracite coal mines: minimum environmental protection performance standards; anthracite bank removal and reclamation: minimum environmental protection performance standards; and anthracite refuse disposal: minimum environmental protection performance standards).

25 Pa. Code § 88.50

The provisions of this § 88.50 adopted December 19, 1980, 10 Pa.B. 4789, effective 7/31/1982, 12 Pa.B. 2382.

This section cited in 25 Pa. Code § 86.261 (relating to program services); and 25 Pa. Code § 88.41 (relating to operation plan: requirements).