Section 87.160 - Haul roads and access roads
(a) Haul roads and access roads shall be designed, constructed and maintained to control or prevent erosion and contributions of sediment to streams or runoff outside the affected area; air and water pollution; damage to fish and wildlife or their habitat; flooding; and damage to public or private property. To ensure environmental protection appropriate for their planned duration and use, including consideration of the type and size of equipment used, the design and construction or reconstruction of roads shall incorporate appropriate limits for grade, width, surface materials, surface drainage control, culvert placement and culvert size, in accordance with current, prudent engineering practices and necessary design criteria established by the Department. Upon completion of the associated surface mining activities, the area disturbed by the road shall be restored in accordance with § 87.166 (relating to haul roads and access roads: restoration) unless retention of the road is approved as part of the postmining land use.
(b) The haul or access road may not be located in or within 100 feet (30.48 meters) of a perennial or intermittent stream except in accordance with § 86.102 (relating to areas where mining is prohibited or limited). A crossing of a perennial or intermittent stream shall be made using bridges, culverts or similar structures. Bridges, culverts or other encroachment or water obstruction shall meet the requirements of Chapter 105 (relating to dam safety and waterway management).
(c) Each road shall have a drainage system that is compatible with the natural drainage system, is structurally stable, and which will pass safely the peak flow from a 10-year, 24-hour precipitation event or larger event if required by the Department. The drainage system shall include a sloped or crowned road surface, cross drains or culverts, stabilized ditches, erosion-resistant surfacing, sediment traps and other appropriate sediment control measures as required by § 87.106 (relating to hydrologic balance: sediment control measures).
(d) Roads shall be constructed on stable areas that avoid wet or unstable soils.
(e) Prior to the construction of the road, topsoil shall be removed, stored on a stable site and protected against erosion and compaction until restoration of the haul road.
(f) Disturbed areas adjacent to the road shall be vegetated or otherwise stabilized to prevent erosion.
(g) Haul roads shall be surfaced with material sufficiently durable for the anticipated volume of traffic and the weight and speed of vehicles using the road. Acid or toxic-forming material may not be used for surfacing or construction of a road except where the road is within the confines of a coal refuse disposal or reprocessing area and the effluent meets the requirements of § 87.102 (relating to hydrologic balance: effluent standards).
(h) A road damaged by a catastrophic event, such as a flood or earthquake, shall be repaired or reclaimed as soon as practicable after the damage has occurred.
(i) Haul roads and roads approved as part of the postmining land use shall be certified by a qualified registered professional engineer or qualified registered land surveyor that the roads have been constructed or reconstructed as designed in accordance with the approved plan.

25 Pa. Code § 87.160

The provisions of this §87.160 adopted December 19, 1980, 10 Pa.B. 4789, effective 7/31/1982, 12 Pa.B. 2382; amended July 30, 1982, 12 Pa.B. 2473, effective 7/31/1982, 12 Pa.B. 2382; amended June 25, 1993, effective 6/26/1993, 23 Pa.B. 3075; amended May 8, 1998, effective 5/9/1998, 28 Pa.B. 2227; amended May 31, 2002, effective 6/1/2002, 32 Pa.B. 2686.

The provisions of this §87.160 amended under section 4.2 of the Surface Mining Conservation and Reclamation Act (52 P. S. § 1396.4b(a)); section 3.2 of the Coal Refuse Disposal Control Act (52 P. S. § 30.53b); and section 1920-A of The Administrative Code of 1929 (71 P. S. § 510-20).

This section cited in 25 Pa. Code § 86.134 (relating to coal exploration performance and design standards); 25 Pa. Code § 87.80 (relating to haul roads, access roads and other transportation facilities); and 25 Pa. Code § 87.174 (relating to steep slope operations).