Current through Register Vol. 54, No. 49, December 7, 2024
Section 83.282 - Summary of plan(a) The plan must contain a summary that includes: (1) A manure summary table listing:(i) The total amount of manure planned to be generated on the operation annually.(ii) The total amount of manure planned to be used on the operation annually.(iii) The total amount of manure planned to be exported from the operation annually.(2) A nutrient application summary documenting the planned nutrient applications for each crop management unit listing:(iii) Nutrients applied as starter chemical fertilizer.(iv) Planned manure application period.(v) Planned manure application rate and type of manure to be applied.(vi) Planned manure incorporation time.(vii) Rate of other organic nutrient sources planned to be applied.(viii) Other nutrients applied through chemical fertilizer.(ix) Other comments or notes.(3) General procedures and provisions for the utilization or proper disposal of excess manure.(b) The summary must include the following information on planned BMPs: (1) Planned manure management and storage practices, stormwater runoff control practices and other appropriate BMPs necessary to protect the quality of surface water and groundwater.(2) The schedule for implementation of the planned BMPs.(3) The locations of planned BMPs on the agricultural operation.The provisions of this § 83.282 amended June 2, 2006, effective 10/1/2006, 36 Pa.B. 2636. This section cited in 25 Pa. Code § 83.201 (relating to definitions); 25 Pa. Code § 83.204 (relating to applicability of requirements); 25 Pa. Code § 83.261 (relating to general); and 25 Pa. Code § 83.272 (relating to content of plans).