Section 78a.59b - Well development impoundments(a) In addition to meeting the requirements of § 78a.59a (relating to impoundment embankments), any new well development impoundments must be in compliance with this section.(b) A well operator using a well development impoundment prior to October 8, 2016, shall register the location of the well development impoundment by December 7, 2016, by providing the Department, through the Department's web site, with electronic notification of the GPS coordinates, township and county where the well development impoundment is located as well as certification as to whether the impoundment meets the requirements in subsections (d), (e) and (h). Any impoundments that do not comply with the requirements in subsections (d), (e) and (h) shall be upgraded to meet these requirements or restored in accordance with subsection (g) by October 10, 2017.(c) A well operator shall register the location of a new well development impoundment prior to construction. Registration of the well development impoundment may be transferred to another operator. Registration transfers shall utilize forms provided by the Department and be submitted electronically to the Department through its web site.(d) Well development impoundments shall be constructed with a synthetic impervious liner.(e) Unless an individual is continuously present at a well development impoundment, a fence must completely surround the well development impoundment to prevent unauthorized acts of third parties and damage caused by wildlife.(f) The bottom of the impoundment must be at least 20 inches above the seasonal high groundwater table. The applicant may maintain the required separation distance of 20 inches by passive artificial means such as an under-drain system throughout the lifetime of the impoundment. In no case shall the regional groundwater table be affected by the passive artificial system. The operator shall document the depth of the seasonal high groundwater table, the manner in which the depth of the seasonal high groundwater table was ascertained, the distance between the bottom of the impoundment and the seasonal high groundwater table, and the depth of the regional groundwater table if the separation between the impoundment bottom and seasonal high groundwater table is maintained by artificial means. A soil scientist or other similarly trained person using accepted and documented scientific methods shall make the determination. The determination must contain a statement certifying that the impoundment bottom is at least 20 inches above the seasonal high groundwater table according to observed field conditions. The name, qualifications and statement of the person making the determination and the basis of the determination shall be provided to the Department upon request.(g) Well development impoundments shall be restored by the operator that the impoundment is registered to within 9 months of completion of hydraulic fracturing of the last well serviced by the impoundment. An impoundment is restored under this subsection by the operator removing excess water and the synthetic liner, returning the site to approximate original conditions, including preconstruction contours, and supporting the land uses that existed prior to oil and gas operations to the extent practicable. An extension of the restoration requirement may be approved under § 78a.65(c) (relating to site restoration). If requested by the landowner in writing, on forms provided by the Department, the requirement to return the site to approximate original contours may be waived by the Department if the liner is removed from the impoundment.(h) Prior to storing mine influenced water in a well development impoundment, the operator shall develop a mine influenced water storage plan and submit it to the Department for approval. (1) The mine influenced water storage plan shall be submitted on forms provided by the Department and include the following: (i) A demonstration that the escape of the mine influenced water stored in the well development impoundment will not result in air, water or land pollution, or endanger persons or property.(ii) A procedure and schedule to test the mine influenced water. This testing shall be conducted at the source prior to storage in the impoundment.(iii) A records retention schedule for the mine influenced water test results.(2) An operator with an approved mine influenced water storage plan shall maintain records of all mine influenced water testing prior to storage. These records shall be made available to the Department upon request.(i) The Department may require the operator to test water sources proposed to be stored in a well development impoundment prior to storage. This section cited in 25 Pa. Code § 78a.63a (relating to alternative waste management).