When emergency repairs are necessary, prior notification under § 78.401(c) (relating to storage well construction) is not required. The operator shall give notice to the Department within 24 hours of the repairs. Within 5 days of the emergency, the operator shall submit a written explanation of the emergency and the corrective action taken, or planned. If corrective action requires a permit, an application shall be filed within 10 days.
25 Pa. Code § 78.405