Current through Register Vol. 54, No. 45, November 9, 2024
Section 78.83 - Surface and coal protective casing and cementing procedures(a) For wells drilled, altered, reconditioned or recompleted after February 5, 2011, surface casing or any casing functioning as a water protection casing may not be utilized as production casing unless one of the following applies:(1) In oil wells where the operator does not produce any gas generated by the well and the annulus between the surface casing and the production pipe is left open.(2) The operator demonstrates that the pressure in the well is no greater than the pressure permitted under 78.73(c) (relating to general provision for well construction and operation), demonstrates through a pressure test or other method approved by the Department that all gas and fluids will be contained within the well, and installs a working pressure gauge that can be inspected by the Department.(b) If the well is to be equipped with threaded and coupled casing, the operator shall drill a hole so that the diameter is at least 1 inch greater than the outside diameter of the casing collar to be installed. If the well is to be equipped with plain-end welded casing, the operator shall drill a hole so that the diameter is at least 1 inch greater than the outside diameter of the casing coupling.(c) The operator shall drill to approximately 50 feet below the deepest fresh groundwater or at least 50 feet into consolidated rock, whichever is deeper, and immediately set and permanently cement a string of surface casing to that depth. Except as provided in subsection (f), the surface casing may not be set more than 200 feet below the deepest fresh groundwater except if necessary to set the casing in consolidated rock. The surface hole shall be drilled using air, freshwater, or freshwater-based drilling fluid. Prior to cementing, the wellbore shall be conditioned to ensure an adequate cement bond between the casing and the formation. The surface casing seat shall be set in consolidated rock. When drilling a new well or redrilling an existing well, the operator shall install at least one centralizer within 50 feet of the casing seat and then install a centralizer in intervals no greater than every 150 feet above the first centralizer.(d) The operator shall permanently cement the surface casing by placing the cement in the casing and displacing it into the annular space between the wall of the hole and the outside of the casing.(e) Where potential oil or gas zones are anticipated to be found at depths within 50 feet below the deepest fresh groundwater, the operator shall set and permanently cement surface casing prior to drilling into a stratum known to contain, or likely containing, oil or gas.(f) If additional fresh groundwater is encountered in drilling below the permanently cemented surface casing, the operator shall document the depth of the fresh ground water zone in the well record and protect the additional fresh groundwater by installing and cementing a subsequent string of casing or other procedures approved by the Department to completely isolate and protect fresh groundwater. The string of casing may also penetrate zones bearing salty or brackish water with cement in the annular space being used to segregate the various zones. Sufficient cement shall be used to cement the casing to the surface. The operator shall install at least one centralizer within 50 feet of the casing seat and then install a centralizer in intervals no greater than, if possible, every 150 feet above the first centralizer.(g) The operator shall set and cement a coal protective string of casing through workable coal seams. The base of the coal protective casing shall be at least 30 feet below the lowest workable coal seam. The operator shall install at least two centralizers. One centralizer shall be within 50 feet of the casing seat and the second centralizer shall be within 100 feet of the surface.(h) Unless an alternative method has been approved by the Department in accordance with § 78.75 (relating to alternative methods), when a well is drilled through a coal seam at a location where the coal has been removed or when a well is drilled through a coal pillar, the operator shall drill to a depth of at least 30 feet but no more than 50 feet deeper than the bottom of the coal seam. The operator shall set and cement a coal protection string of casing to this depth. The operator shall equip the casing with a cement basket or other similar device above and as close to the top of the coal seam as practical. The bottom of the casing must be equipped with an appropriate device designed to prevent deformation of the bottom of the casing. The interval from the bottom of the casing to the bottom of the coal seam shall be filled with cement either by the balance method or by the displacement method. Cement shall be placed on top of the basket between the wall of the hole and the outside of the casing by pumping from the surface. If the operator penetrates more than one coal seam from which the coal has been removed, the operator shall protect each seam with a separate string of casing that is set and cemented or with a single string of casing which is stage cemented so that each coal seam is protected as described in this subsection. The operator shall cement the well to isolate workable coal seams from each other.(i) If the operator sets and cements casing under subsection (g) or (h) and subsequently encounters additional fresh groundwater zones below the deepest cemented casing string installed, the operator shall protect the fresh groundwater by installing and cementing another string of casing or other method approved by the Department. Sufficient cement shall be used to cement the casing to the surface. The additional casing string may also penetrate zones bearing brackish or salt water, but shall be run and cemented prior to penetrating a zone known to or likely to contain oil or gas. The operator shall install at least one centralizer within 50 feet of the casing seat and then, if possible, install a centralizer in intervals no greater than every 150 feet above the first centralizer.(j) If it is anticipated that cement used to permanently cement the surface casing cannot be circulated to the surface a cement basket may be installed immediately above the depth of the anticipated lost circulation zone. The casing shall be permanently cemented by the displacement method. Additional cement may be added above the cement basket, if necessary, by pumping through a pour string from the surface to fill the annular space. Filling the annular space by this method does not constitute permanently cementing the surface or coal protective casing under § 78.83b (relating to casing and cementing-lost circulation).The provisions of this §78.83 adopted July 28, 1989, effective 7/29/1989, 19 Pa.B. 3229; amended March 6, 1998, effective 3/7/1998, 28 Pa.B. 1234; amended February 4, 2011, effective 2/5/2011, 41 Pa.B. 805. This section cited in 25 Pa. Code § 78.61 (relating to disposal of drill cuttings); 25 Pa. Code § 78.81 (relating to general provisions); 25 Pa. Code § 78.83c (relating to intermediate and production casing); 25 Pa. Code § 78.102 (relating to criteria for approval of inactive status); and 25 Pa. Code § 78.103 (relating to annual monitoring of inactive wells).