Current through Register Vol. 54, No. 45, November 9, 2024
Section 78.81 - General provisions(a) The operator shall conduct casing and cementing activities under this section and §§ 78.82-78.87 or an approved alternate method under § 78.75 (relating to alternative methods). The operator shall case and cement a well to accomplish the following:(1) Allow effective control of the well at all times.(2) Prevent the migration of gas or other fluids into sources of fresh groundwater.(3) Prevent pollution or diminution of fresh groundwater.(4) Prevent the migration of gas or other fluids into coal seams.(b) The operator shall drill through fresh groundwater zones with diligence and as efficiently as practical to minimize drilling disturbance and commingling of groundwaters.The provisions of this §78.81 adopted July 28, 1989, effective 7/29/1989, 19 Pa.B. 3229; amended December 16, 1994, effective 12/17/1994, 24 Pa.B. 6284; amended March 30, 2001, effective 3/31/2001, 31 Pa.B. 1736; amended February 4, 2011, effective 2/5/2011, 41 Pa.B. 805. This section cited in 25 Pa. Code § 78.102 (relating to criteria for approval of inactive status); and 25 Pa. Code § 78.103 (relating to annual monitoring of inactive wells).