Or. Admin. Code § 918-500-0410

Current through Register Vol. 63, No. 10, October 1, 2024
Section 918-500-0410 - Inspection Request
(1) Requests for inspection from a manufacturer must:
(a) Be made to the division by mail, electronic mail, phone, or fax transmittal, and received at least five working days prior to the desired time of inspection; and
(b) Indicate the serial number of the manufactured dwelling to be inspected. Inspection fees must be paid by the manufacturer within 30 days of the billing date.
(2) Requests for inspection from a dealer must:
(a) Be made on forms supplied by the division, and received at least five working days prior to the desired date of inspection;
(b) Indicate the location, make, model, and serial number of the manufactured dwelling; and
(c) Be accompanied by the minimum inspection fees required by OAR 918-500-0100 and 918-500-0110. All additional inspection fees are payable upon completion of each inspection.
(3) All work must be accessible for inspection by the division.
(4) Occupancy may not prevent the physical inspection of manufactured dwelling alterations, repairs, or installations.

Or. Admin. Code § 918-500-0410

BCA 1-1990, f. & cert. ef. 1-2-90; BCA 10-1992, f. 6-15-92, cert. ef. 7-1-92; BCD 2-1994, f. 1-14-94, cert. ef. 2-1-94; BCD 19-1995, f. 12-15-95, cert. ef. 1-1-96; BCD 22-1998, f. 11-9-98, cert. ef. 1-1-99; BCD 1-2010, f. 3-1-10, cert. ef. 4-1-10

Stat. Auth.: ORS 446.176 & 446.230

Stats. Implemented: ORS 446.155