Current through Register Vol. 63, No. 10, October 1, 2024
Section 918-309-0025 - Phased Permitting(1) During the plan review process, an electrical contractor may request a complete or partial permit before the entire plans and specifications are submitted or approved, if adequate information is provided showing compliance with pertinent portions of the code. The permittee proceeds at his or her own risk, without assurance that the permit for the entire installation will be granted, or that corrections will not be required, including those portions permitted. The partial permit shall allow the electrical contractor to proceed with work pertaining to the electrical system of the structure.(2) Any inspections performed by the local jurisdiction on the site or of the ground work shall be counted toward the number of electrical inspections allowed by the full permit once plan review is complete and the permit is issued.Or. Admin. Code § 918-309-0025
BCD 9-2003, f. 6-13-03, cert. ef. 7-1-03Stat. Auth.: ORS 479.730
Stats. Implemented: ORS 479.730