Current through Register Vol. 63, No. 12, December 1, 2024
Section 918-308-0300 - Review of Municipality Program(1) The division shall conduct a comprehensive review of each municipality delegated administration of the electrical program at least every five years.(2) A comprehensive review shall be conducted by a minimum team of: (a) One local building official;(b) One electrical contractor or contractor's representative;(c) Division chief electrical inspector or Oregon Electrical Specialty Code inspector if the chief inspector is unable to serve; and(d) One division representative;(e) Optionally, a general contractor registered with the Construction Contractors Board, if nominated by the municipality involved;(f) Optionally, additional persons, depending on the size and complexity of the municipality involved, as determined and selected by the division.(3) A single-purpose review shall be conducted by the division chief electrical inspector or designee and others selected by the division if the operations of the municipality are at variance with its approved operating plan.Or. Admin. Code § 918-308-0300
BCA 11-1988, f. & cert. ef. 7-20-88; BCA 21-1993, f. 10-5-93, cert. ef 12-1-93; BCD 19-1996, f. 9-17-96, cert. ef. 10-1-96, Renumbered from 918-303-0010; BCD23-2008, f. 9-30-08, cert. ef. 10-1-08Publications: Publications referenced are available from the agency.
Stat. Auth.: ORS 479.730
Stats. Implemented: ORS 479.855, 455.148 & 455.150