Or. Admin. Code § 812-025-0015

Current through Register Vol. 63, No. 12, December 1, 2024
Section 812-025-0015 - Qualifications for Certification: Skill to Perform Installation

ODOE adopted performance skill standards that the board applies in granting certification. Under the ODOE standards, a contractor is qualified if:

(1) It holds a current and valid BPI accredited contractor.
(2) It is owned by or employs one or more persons who hold a current and valid BPI certificate in at least one of the following disciplines:
(a) Building analyst;
(b) Envelope;
(c) Heating;
(d) Air conditioning/heat pump;
(e) Manufactured housing;
(f) Multifamily.
(3) It is owned by or employs one or more persons who hold a current and valid REAP certificate as one or more of the following:
(a) Energy Analyst-1;
(b) Energy Analyst-2;
(c) Shell Tech-1;
(d) Diagnostic Tech-1;
(e) Building Performance Specialist-1.

Or. Admin. Code § 812-025-0015

CCB 17-2010, f. 12-22-10, cert. ef. 1-1-11

Stat. Auth.: ORS 670.310 & 701.235

Stats. Implemented: ORS 470, 670.310, 701.108, 701.119 & 2009 OL Ch. 753