Current through Register Vol. 63, No. 11, November 1, 2024
Section 741-320-0140 - Walkways in Tunnels(1) A walkway conforming to OAR 741-320-0080 (Standard No. 1), shall be constructed and maintained in a tunnel, upon order of the Department, only after notice to the affected railroad and hearing (in case of dispute), and be located as close as is possible to the tunnel wall, with its surface as close as possible to the top of ties.(2) At each end of a tunnel the walkway shall be gradually tapered in accordance with OAR 741-320-0070 (slope) to meet the base of the ballast section or an existing walkway.Or. Admin. Code § 741-320-0140
PUC 13-1981, f. & ef. 12-21-81 (Order No. 81-900); PUC 4-1983, f. & ef. 5-3-83 (Order No. 83-242); PUC 26-1985, f. & ef. 12-19-85 (Order No. 85-1196); RS 2-1996, f. & cert. ef. 3-14-96; Renumbered from 860-044-0332; RS 2-1998, f. & cert. ef. 8-20-98Stat. Auth.: ORS 184.616, ORS 184.619, ORS 823.011 & ORS 824.056
Stats. Implemented: ORS 824.050 & ORS 824.056