Or. Admin. Code § 734-051-5050

Current through Register Vol. 63, No. 12, December 1, 2024
Section 734-051-5050 - Responsibility for Costs of Construction of Approaches
(1) Costs the Permittee Bears. Except as otherwise provided in the division 51 rules, the permittee is responsible for the cost of mitigation measures and the cost of construction of an approach, including the cost of materials, labor, signing, signals, structures, equipment, traffic channelization, and other permit requirements.
(2) Costs the Department May Bear. The department may be responsible for:
(a) The cost of mitigation measures and the cost of construction of an approach where the costs are a part of the terms and conditions of a right of way acquisition obligation or other departmental contractual agreement; and/or
(b) The cost of removal or relocation of a legal approach upon highway right of way during project delivery.

Or. Admin. Code § 734-051-5050

HWD 16-2011(Temp), f. 12-22-11, cert. ef. 1-1-12 thru 6-29-12; HWD 8-2012, f. 6-27-12, cert. ef. 6-29-12

Stat. Auth.: ORS 184.616, 184.619, 374.310-374.314, 374.345 & 374.355

Stats. Implemented: ORS 374.300-374.360, §27, ch. 330, OL 2011