Prequalification requirements for contracts may be waived by the Highway Division Administrator or Chief Engineer under the following circumstances:
Or. Admin. Code § 731-007-0550
Stat. Auth.: ORS 184.616, 184.619, 279A.050, 279A.065, 279C.430
Stats. Implemented: ORS 279C.430