Current through Register Vol. 64, No. 1, January 1, 2025
Section 731-007-0500 - Mandatory Contractor Prequalification(1) All bidders on public improvement projects procured pursuant to OAR, Chapter 731 Division 5, except for those that are procured through an Exempted Selection Method as set forth in OAR 731-005-0440(2), must be prequalified.(2) OAR, Chapter 731 Division 7 is not applicable to the procurement of projects utilizing an Alternative Contracting Method.(3) Bidders must be prequalified in the class(es) of work designated in the special provisions for the specific project on which the Bidder desires to bid.Or. Admin. Code § 731-007-0500
DOT 2-2016, f. & cert. ef. 4/29/2016; DOT 1-2024, amend filed 05/09/2024, effective 6/1/2024Statutory/Other Authority: ORS 184.619, 279A.050 & 279A.065
Statutes/Other Implemented: ORS 279C.430