Current through Register Vol. 64, No. 1, January 1, 2025
Section 731-017-0015 - Applications for Time Extensions, Alternative Funding Plans, or Adjustments or Alternatives to Traffic Performance Measures(1) When a local government amendment needed to authorize an economic development project cannot meet the funding requirements of the Transportation Planning Rule as they relate to state highways, the local government may apply for: (a) An extension of time to meet the requirements of OAR 660-012-0060(2)(b), 660-012-0060(4)(b)(D) or 660-012-0060(4)(c)(A);(b) Approval of a plan proposing alternative methods of funding that meets the provisions in this division;(c) An adjustment to existing traffic performance measures or allowance to use an alternative traffic performance measure other than a volume to capacity ratio with a proposed acceptable level of performance during an interim period prior to completion of construction of an economic development project for a period of no more than 20 years; or(d) An adjustment to existing traffic performance measures or allowance to use an alternative traffic performance measure other than a volume to capacity ratio with a proposed acceptable level of performance that address the specific traffic impacts of an economic development project.(2) Applications under subsection (1) of this Section shall be filed with ODOT for Commission review and approval. The Commission may approve up to four applications in each ODOT Region in a calendar year.(3) The provisions of this rule do not apply to Commission approval of alternate mobility standards authorized and processed pursuant to OHP Policy 1F Action 1F.3 in system or facility planning processes.Or. Admin. Code § 731-017-0015
DOT 3-2010, f. & cert. ef. 12-22-10Stat. Auth.: ORS 184.616, 184.619 & 367.850
Stats. Implemented: ORS 367.850