Or. Admin. Code § 690-502-0260

Current through Register Vol. 64, No. 1, January 1, 2025
Section 690-502-0260 - Special Permit Conditions

New permits issued to appropriate groundwater from aquifers within the Sandy-Boring Groundwater Limited Area and the Troutdale aquifer in the Damascus Groundwater Limited Area shall be specially conditioned. The conditions shall specify:

(1) A static water level measurement be made and submitted before any use of water may commence at the well;
(2) Limits on acceptable amounts of depletion and interference with other users;
(3) Use of water from the well be controlled or shut off if limits specified in the permit to protect the resource from depletion, and prior appropriators from interference, are exceeded;
(4) The Department shall determine, from measurements submitted by the permittee/appropriator, or other data on file in the department, the initial and subsequent water levels from which the previously cited declines are referenced;
(5) Following the issuance of a permit, the permittee/appropriator shall measure the water levels in the permitted well each year between March 1 and March 31 (spring high-water level) and submit the data to the Department within 90 days of measurement. Water level measurements shall be made by a certified water rights examiner, licensed water well driller, licensed pump installer, registered geologist, licensed land surveyor, registered professional engineer or the permittee/appropriator;
(6) Any other conditions as specified in OAR chapter 690, division 008 as deemed necessary to protect the groundwater resource.

Or. Admin. Code § 690-502-0260

WRD 3-2003, f. & cert. ef. 12-4-03, Renumbered from 690-502-0160

Stat. Auth.: ORS 536 & ORS 537

Stats. Implemented: