Evidence of failure to comply with the requirements of OAR 690-240, special standards as described in 690-240-0006, or those standards of a state agency to which the Director has delegated direct responsibility under 690-240-0016 shall include, but not be limited to, the following:
(1) A specific standard to which the Director has agreed is violated.(2) Evidence that contamination is occurring as a result of a monitoring well, geotechnical hole, or other hole construction.(3) Evidence that a monitoring well, geotechnical hole, or other hole, due to its construction, is causing or contributing to the loss of artesian pressure within an aquifer.Or. Admin. Code § 690-240-0550
WRD 14-1990, f. & cert. ef. 8-9-90; WRD 8-1993, f. 12-14-93, cert. ef. 1-1-94; WRD 7-2001, f. & cert. ef. 11-15-01; WRD 1-2003, f. & cert. ef. 3-14-03, Renumbered from 690-240-0145Stat. Auth.: ORS 536.090 & 537.505 - 537.795
Stats. Implemented: ORS 536.090 & 537.505 - 537.795