In order for the Director to delegate responsibility for monitoring wells, geotechnical holes and other holes to another agency, construction, operation or use, maintenance, and abandonment standards developed by that agency pursuant to OAR 690-240-0015 shall include, but not be limited to, provisions to address the following factors:
(1) Reporting well or hole location.(2) Reporting intended use of the well or hole.(3) Reporting well or hole design or construction.(4) Assigning responsibility for compliance.(5) Protecting ground water through minimum standards for the construction, operation or use, maintenance, and abandonment of the monitoring well, geotechnical hole or other hole that provide ground water protection equivalent to that provided by OAR 690-240-0005 to 690-240-0540.Or. Admin. Code § 690-240-0020
WRD 14-1990, f. & cert. ef. 8-9-90; WRD 8-1993, f. 12-14-93, cert. ef. 1-1-94; WRD 2-1995, f. 5-17-95, cert. ef. 7-1-95; WRD 7-2001, f. & cert. ef. 11-15-01; WRD 1-2003, f. & cert. ef. 3-14-03Stat. Auth.: ORS 536.090 & ORS 537.505 - ORS 537.795
Stats. Implemented: ORS 536.090 & ORS 537.505 - ORS 537.795