Upon completion, every well shall be tested for yield and drawdown either by bailing, pumping, or air testing for a period of not less than one hour. Any testing method that does not provide for drawdown measurements during testing is not an accurate or reliable test of yield.
Or. Admin. Code § 690-210-0370
Stat. Auth.: ORS 536.090 & ORS 537.505 - ORS 537.795
Stats. Implemented: