Section 690-210-0320 - Methods of Placement of Cement Grout or Concrete

Cement grout or concrete used as a sealing material in a well shall be placed or forced upward from the bottom to completely fill the annular space to be grouted and shall be placed in one continuous operation without significant interruption. If temporary outer surface casing is used in the construction of the well, it shall be withdrawn as the grout or concrete is placed. (For acceptable methods of placement, see Appendix 210-3 and Figure 210-1).

Or. Admin. Code § 690-210-0320

WRD 9-1978, f. 12-12-78, ef. 1-1-79; WRD 13-1986, f. 10-7-86, ef. 11-1-86, Renumbered from 690-061-0021 & 690-061-0096; WRD 7-1988, f. & cert. ef. 6-29-88; WRD 7-2001, f. & cert. ef. 11-15-01; WRD 5-2015, f. & cert. ef. 7/1/2015; WRD 5-2016, f. & cert. ef.9/6/2016; WRD 1-2017, f. & cert. ef. 2/16/2017; WRD 5-2023, amend filed 06/22/2023, effective 7/1/2023

To view attachments referenced in rule text, click here to view rule.

Statutory/Other Authority: ORS 536.090, ORS 537.505-537.795, ORS 536.027, ORS 536.900 & ORS 537.992

Statutes/Other Implemented: ORS 536.090, ORS 537.505-537.795, ORS 536.900 & ORS 537.992