Or. Admin. Code § 629-610-0080

Current through Register Vol. 63, No. 12, December 1, 2024
Section 629-610-0080 - Revegetation When Reforestation is Not Required

When reforestation is not required or planned, the landowner shall ensure sufficient revegetation of the site to provide continuing soil productivity and stabilization within 12 months of the completion of the operation. Revegetation required by this rule may be planted or naturally established, and shall consist of trees, shrubs, grasses, or forbs suitable for soil stabilization and productivity protection. Landowners are encouraged to revegetate the operation area with native plants.

Or. Admin. Code § 629-610-0080

FB 5-1994, F. 12-23-94, cert. ef. 1-1-95

Stat. Auth.: ORS 527.710

Stats. Implemented: ORS 527.745