Or. Admin. Code § 340-043-0080

Current through Register Vol. 63, No. 12, December 1, 2024
Section 340-043-0080 - General Provisions
(1) Facilities permitted under either a WPCF or NPDES permit shall not discharge wastewater or process solutions to surface water, groundwater or soils, except as expressly allowed by the permit.
(2) Facilities subject to these rules shall not be sited in 100-year floodplains or wetlands. A buffer zone (a minimum of 200 feet wide) shall be established between waste disposal facilities and surface waters.
(3) All chemical conveyances (ditches, troughs, pipes, etc.) shall be equipped with secondary containment and leak detection means for preventing and detecting release of chemicals to surface water, groundwater or soils.
(4) Acid water accumulation in open pits resulting from the mining operation must be prevented by appropriate mining practices, by measures taken in the closure process, or be treated to control pH and toxicity, for the life of the pit.
(5) Construction of surface impoundment liner systems shall conform generally to the principles and practices described inEPA/600/2-88/052, Lining of Waste Containment and Other Impoundment Facilities, September 1988.
(6) The Department may require the permittee to hire a third-party contractor to perform the functions set forth below. Selection of the contractor shall be subject to Department approval:
(a) Review and evaluate the design and construction specifications of all mined-materials disposal facilities permitted under this Division for functional adequacy and conformance with Department requirements. The Department shall not approve construction of the disposal facilities until the design and construction specifications have been evaluated;
(b) Monitor the course of construction of all mined-materials facilities for compliance with the approved design and construction specifications. The third-party contractor shall regularly document the progress of construction and the Department shall require the permittee to take corrective action if construction does not satisfactorily conform to the approved design and construction specifications;
(c) Provide on-site inspections during ongoing operations, including but not limited to the loading of the heap, to assure protection of the integrity of the liner system and other environmental protection measures.

Or. Admin. Code § 340-043-0080

DEQ 23-1992, f. & cert. ef. 9-8-92

Publications: The publication(s) referred to or incorporated by reference in this rule are available from the agency.

Stat. Auth.:ORS 468.020

Stats. Implemented:ORS 468.020 &ORS 468B.055