Current through Register Vol. 63, No. 10, October 1, 2024
Section 340-245-9020 - Colored Art Glass Manufacturing Facility Rules; Permit Required(1) Not later than December 1, 2016, if located within the Portland AQMA, and not later than April 1, 2017, if located outside the Portland AQMA, all CAGMs not otherwise subject to a permitting requirement must apply for a permit under OAR 340-216-8020 Table 2, Part B, category #84.(2) A CAGM that applies for a permit on or before the required date is not in violation of OAR 340-216-0020(3).(3) CAGMs constructed after September 1, 2016 must obtain a permit prior to construction. NOTE: This rule was moved verbatim from OAR 340-244-9020 and renumbered.
Or. Admin. Code § 340-245-9020
DEQ 197-2018, adopt filed 11/16/2018, effective 11/16/2018Statutory/Other Authority: ORS 468.020, 468A.025 & 468A.040
Statutes/Other Implemented: 468A.025 & 468A.040