Current through Register Vol. 63, No. 12, December 1, 2024
Section 340-244-0241 - Gasoline Dispensing Facilities: GDF 3(1) The owner or operator of a GDF 3 as described in OAR 340-244-0234(4) must comply with the following requirements: (a) All applicable requirements under OAR 340-244-0238; and(b) Testing requirements under OAR 340-244-0249.(2) The owner or operator of a GDF 3 which commenced construction on or after July 1, 2024 must comply with OAR 340-244-0248 and install a dual-point vapor balance system on each gasoline storage tank with 250 gallon or greater capacity. Notwithstanding the testing requirements of OAR 340-244-0249, a complete Stage I vapor balance system must be installed before equipment is placed into gasoline service.(3) The owner or operator of a GDF 3 which commenced construction before July 1, 2024 must comply with OAR 340-244-0248 and install a dual-point vapor balance system on each new or replaced gasoline storage tank with 250 gallon or greater capacity. [NOTE: This rule is included in the State of Oregon Clean Air Act Implementation Plan that EQC adopted under OAR 340-200-0040 only for affected sources in the Portland-Vancouver, Medford-Ashland, and Salem-Keizer Area Transportation Study air quality management areas and all of Clackamas, Multnomah, and Washington counties.]
Or. Admin. Code § 340-244-0241
DEQ 4-2024, adopt filed 03/25/2024, effective 3/25/2024Statutory/Other Authority: ORS 468.020 & ORS 468A.025
Statutes/Other Implemented: ORS 468A.025