Rubidium-82 generators require quality assurance procedures for equipment, patient injection, waiting area, imaging, and post-imaging care. There also must be a procedure for spills, and a handling procedure for liquid quality assurance sources for early model PET cameras. Dose calibration procedures are the same as in OAR 333-116-0850(6).
Or. Admin. Code § 333-116-0870
Statutory/Other Authority: ORS 453.635
Statutes/Other Implemented: ORS 453.605 - 453.807