Or. Admin. Code § 333-116-0150

Current through Register Vol. 63, No. 12, December 1, 2024
Section 333-116-0150 - Quality Control of Imaging Equipment
(1) Each licensee must establish written quality control procedures for all diagnostic equipment used to obtain images from radionuclide studies. As a minimum the quality control procedures and frequencies must include quality control procedures recommended by equipment manufacturers or procedures which have been approved by the Authority. The licensee must conduct quality control procedures in accordance with written procedures.
(2) Copies of procedures and records generated from implementing these procedures must be maintained in accordance with OAR 333-100-0057.

Or. Admin. Code § 333-116-0150

HD 1-1991, f. & cert. ef. 1-8-91; PH 3-2003, f. & cert. ef. 3-27-03; PH 31-2004(Temp), f. & cert. ef. 10-8-04 thru 4-5-05; PH 36-2004, f. & cert. ef. 12-1-04; PH 12-2006, f. & cert. ef. 6-16-06; PH 4-2007, f. & cert. ef. 3-1-07; PH 14-2008, f. & cert. ef. 9-15-08; PH 5-2018, minor correction filed 01/30/2018, effective 1/30/2018

Statutory/Other Authority: ORS 453.635

Statutes/Other Implemented: ORS 453.605 - 453.807